When we use the salt spray test chamber in each test or at the end of the test, the solution of the measuring cup should be emptied and cleaned in time to avoid the accumulation of salt solution crystals, which will affect the calculation of sedimentation.
When not in use for a long time, the water in the saturated tank should be drained. The water in the saturator should also be replaced regularly during normal use. When restarting the test, all electrical systems should be inspected.
If the nozzle is blocked of the salt fog chamber, remove the nozzle of the salt spray tester and clean it with alcohol(or xylene) 1:1 hydrochloric acid, another way is dredge it with ultra-fine wire.
The requirements of the environment during the use of salt fog test cases.
1. The distance between the test chamber and the test chamber shall be sixty centimeters or more.
2. The ambient temperature of the equipment should be stable between fifteen and thirty degrees Celsius.
3. Do not be exposed to sunlight or other strong light sources.
4. Avoid strong gas flow. If it cannot be avoided completely, there should be no airflow directly to the box. High concentrations of dust and corrosive substances are not allowed in the environment.
5. voltage fluctuation is less than or equal to plus or minus 10%.

Welcome to consult anything you are interested about our chamber!
Xi'an LIB Environmental Simulation Industry
Sales Center
Tel: +86 (0)29 68918976-605
Mail: info@lib-industry.com; Serena@lib-industry.com
Skype: serena_lib





