+8618700875368

Operation Process of Thermal Shock Test Chamber

May 13, 2022

The thermal shock test chamber, also known as the high and low temperature shock test chamber, is an environmental test equipment used to test material structures or composite materials.


Thermal Shock Test Process


The thermal shock test chamber is used in the test. We must first understand the process steps of the test, as follows:


thermal equipment (5).jpg

Thermal Shock Test Chamber

thermal equipment (6).jpg

Thermal Shock Test Chamber


1. Initial Detection

Compare the tested sample with the standard requirements, and directly put it into the thermal shock test chamber after meeting the requirements.


2. Test

1) The test sample should be placed in the test box according to the standard requirements, and the temperature in the test box (room) should be raised to the specified point, and kept for a certain period of time until the test sample reaches a stable temperature, whichever is longer.


2) After the high temperature stage, transfer the test sample to a low temperature test chamber (chamber) that has been adjusted to -55°C within 5 minutes, and keep it for 1 hour or until the test sample reaches a stable temperature, whichever is longer.


3) After the low temperature stage, transfer the test sample to a high temperature test chamber (chamber) that has been adjusted to 70°C within 5 minutes, and keep it for 1 hour or until the test sample reaches a stable temperature, whichever is longer.


4) Repeat the above experimental method to complete three cycles. Time may vary slightly depending on sample size and space.


3. Recovery

After the test sample is taken out of the test chamber, it should be recovered under normal test atmospheric conditions until the test sample reaches a stable temperature.


4. Detection

The test results are evaluated against the damage degree in the standard and other methods.


Send Inquiry